Projects are Technically & Strategically Challenging 
SCG can support you to 
achieve your goals
Our Projects
We thrive in supporting our clients to achieve their targets. The team at SCG provide the experience, specific skills & knowledge you need. Browse below to view some of our most recent projects.
Rolling Stock Projects
Our Rolling Stock Portfolio includes various Train & Tram projects Australia-wide from new build projects through to fleet upgrades and overhaul programs.
- 
      
      
      
        
  
       V/Locity System UpdatesMechanical & Electrical System Updates 
 A series of Interior, Mechanical & System updates to V/Line’s V/Locity passenger long haul cars incorporating changes such as: a new catering facility, seating USB chargers, grab railing, luggage storage, lighting systems & additional accessibility spaces.
- 
      
      
      
        
  
       ACOREL Passenger Counting TrialSystem Trial for SA Flexity & Citadis Fleets 
 The South Australian DIT implemented a passenger counting system to their Flexity & Citadis tram fleets to gather patronage data & improve services. Engaged by ACOREL, SCG assists in providing Engineering, Project Management & Installation support.
- 
      
      
      
        
  
       MTM Comeng Train UpgradesLife Extension Upgrades - Brake Systems 
 To meet Melbourne’s growing railway patronage, Metro Trains Melbourne (MTM) pledged to extend the service life of the COMENG fleet through the completion of the COMENG Life Extension (CLE) Project.
- 
      
      
      
        
  
       MTM Comeng Train UpgradesLife Extension Upgrades - Doors 
 Metro Trains Melbourne (MTM) committed to overhauling the COMENG Passenger, Inter-car and Cab doors. SCG provided Project Engineering support to MTM through all phases of the project life cycle.
- 
      
      
      
        
  
       Alstom Citadis Tram UpgradeVigilance System Upgrade - Citadis Tram Fleet 
 SCG implemented a vigilance system upgrade across the fleet of 9 Alstom Citadis 302 trams for the South Australian Department of Planning, Transport & Infrastructure (DPTI). This safety-critical upgrade was identified as an essential solution to reducing injuries to tram operators.
- 
      
      
      
        
  
       Siemens Combino Tram UpgradesD-Class Passenger Information System (PIS) 
 SCG was engaged by Yarra Trams (YT) to manage the procurement, prototyping, drafting, installation, testing & commissioning of a passenger information system upgrade for 59 Siemens Combino trams within the YT Melbourne fleet.
- 
      
      
      
        
  
       Adelaide New Build TrainSCG’s Project Inspector acted as the customer appointed representative (DIT) to ensure each unit was manufactured and tested as per the contract, ensuring achievement of compliance and quality. 
- 
      
      
      
        
  
       Tram Site AssessmentYarra Trams commissioned SCG to undertake a “Site Suitability Assessment” of existing Yarra Trams sites that could potentially meet the requirements to safely and effectively conduct the project. 
- 
      
      
      
        
  
       Queensland 16 Year OverhaulSCG were engaged to support Downer (in both Brisbane and Maryborough in Queensland), with the engineering design of modifications to the Lighting and Brakes & Pneumatics subsystems. 
- 
      
      
      
        
  
       Tram Periodicity AssessmentSCG was engaged to support the Torrens Connect team in their Engineering Change process for the for the Alstom Citadis 302 trams ‘C6’ (500,000km) service to extend to 600,000km. 
- 
      
      
      
        
  
       HCMT Systems Safety AssuranceCRRC required specialist support to deliver Systems Safety Assurance for the new fleet of High-Capacity Metro Trains entering service in Melbourne. - Reviewing and assessing the safety impact of failures and faults (FRACAS) 
- Engineering design changes (ECPs/ECRs)-Routine and type test procedures 
- Quality alerts; and 
- Level 3 unverified safety requirements in all phases of Testing and Commissioning. 
 
- 
      
      
      
        
  
       Tender SupportSCG provides niche tender support services for large infrastructure projects across a range of clients within the Transport industry including Rolling Stock, Tunnels, Rail Infrastructure and Maintenance Contracts. 
- 
      
      
      
        
  
       D Class Detailed Damage Assessment & Repair SchemeStrategic Connections Group is your tram restoration specialist. We took on the intricate project of restoring Yarra Trams' D2-Class tram 5017, which had faced severe collision damage. Our four-phase approach, comprising damage assessment, repair scheme development, part procurement, and recommissioning, breathed new life into this valuable asset, showcasing our commitment to safety and efficient project management. 
- 
      
      
      
        
  
       Siemens Nexas Midlife Works ProjectAs part of Metro Trains Melbourne’s MR contract obligations, SCG was engaged to enhance the presentation and accessibility of the Siemens Nexas train fleet. Our team provided end-to-end project management, mechanical design engineering, and stakeholder engagement to deliver critical upgrades that improve the passenger experience while ensuring compliance with accessibility and safety standards. 
- 
      
      
      
        
  
       V/Locity Electrical System Engineering SupportSCG was engaged to provide electrical system engineering support for the new V/Locity diesel multiple unit (DMU) trains, part of a $250 million investment by the Victorian Government. Our team played a critical role in project management, electrical engineering, and risk mitigation, ensuring seamless integration of modernised electrical systems into Victoria's regional rail network. 
 
                         
             
             
            